Avoca gas main (63mm and 125mm pipe)
Using two crews on this project, operating the 18/22 and the 24/40 directional drill rigs, Pipe Pro Drilling spent several months in 2015 installing both 63mm and 125mm pipe in Avoca.
The project was completed by December 2015 and successfully supplied houses in the Victorian town of Avoca with natural gas.