NBN Rollout – Ballarat, Bendigo, Geelong & Stawell
As part of the NBN rollout across Victoria, Pipe Pro Drilling were involved in the underground installation of pit and pipe across Victoria. Several suburbs and towns required a number of kilometres of 63mm pipeline for residents to be provided with access to the NBN. Our work involved all aspects of NBN infrastructure including the boring of underground conduit, construction of node cabinets and installation of pits.