Huntly Township Gas Main (63mm and 125mm pipe)
This was the first gas installation project that Pipe Pro Drilling were involved in and ran for serveral months over 2013-2014. The 18/22 directional drill rig was used and with a small crew of Jason and two others we worked through six kilometres of 63mm and 125mm pipe installation.
The ground conditions in Huntly were quite rocky and travelling from our base in Ballarat meant our crew were faced with a very challenging job. After almost 5 months the job was completed and the client was very pleased with the standard of our work.