Haddon Rising Sewer Main (225mm pipe)
The 24/40 directional drill rig was used to complete this sewer main on the outskirts of Ballarat. Larger diameter 225mm pipe was installed to grade, which increased the degree of difficulty but with a small crew, the job was successfully completed in under a week.