Geelong to Torquay Gas Pipe Line (180mm pipe)
Two crews were used on this project to install the larger pipe which required both the 24/40 and the 18/22 direction drill rigs to be in operation.
Along with the excavator and vacuum truck, all crew members were utilised on this project to ensure the job was completed by the due date and to the highest standard.