Creswick Creek Crossing (350mm pipe)
350mm pipe is some of the largest pipe Pipe Pro Drilling installs and this job presented itself as quite challenging from the outset not only due to the large diameter pipe but also the fact the pipe needed to be bored under a creek in Creswick.
Inclement weather meant the job was postponed twice before we could get our machinery into the area. Jason led this crew and was in charge of drilling using the 24/40 directional drill rig.
Although the job only took a week to complete, it was very difficult due to the location and the conditions. Both Pipe Pro Drilling and the client were very pleased with the end result.