Leongatha

We were involved in installing the 50mm communications conduit to connect the local NBN tower in the area. Total distance spanned over 500 metres across dairy farmland, creeks and forest. The ground conditions were challenging with a great deal of rock under the surface which required the use of our 36x50DR Drilling Rig.

Leongatha Photo 3